MySQL-官方文档摘抄


点击(此处)折叠或打开

  1. There are three phases to an index build.
  2. In the first phase, the clustered index is scanned, and index entries are generated and added to the sort buffer. When the sort buffer becomes full, entries are sorted and written out to a temporary intermediate file. This process is also known as a “run”.
  3. In the second phase, with one or more runs written to the temporary intermediate file, a merge sort is performed on all entries in the file.
  4. In the third and final phase, the sorted entries are inserted into the B-tree.


点击(此处)折叠或打开

  1. When running an online DDL operation, the thread that runs the ALTER TABLE statement applies an “online log” of DML operations that were run concurrently on the same table from other connection threads. When the DML operations are applied, it is possible to encounter a duplicate key entry error (ERROR 1062 (23000): Duplicate entry), even if the duplicate entry is only temporary and would be reverted by a later entry in the “online log”. This is similar to the idea of a foreign key constraint check in InnoDB in which constraints must hold during a transaction.



点击(此处)折叠或打开

  1. Semisynchronous Replication

  2. The slave acknowledges receipt of a transaction's events only after the events have been written to its relay log and flushed to disk. 

半同步只负责relaylog的落盘, 并不关心Slave是否真的有应用这些events, 所以Master的双1+半同步正常可以确认binlog到了Slave端, Slave在不出问题的情况下能做到最终一致性;

上一篇:MySQL5.7并行复制乱序提交引起的同步异常


下一篇:关于avg