Maya Calendar 分类: POJ 2015-06-11 21:44 12人阅读 评论(0) 收藏

Maya Calendar
Time Limit: 1000MS   Memory Limit: 10000K
Total Submissions: 70016   Accepted: 21547

Description

During his last sabbatical, professor M. A. Ya made a surprising discovery about the old Maya calendar. From an old knotted message, professor discovered that the Maya civilization used a 365 day long year, called Haab, which had
19 months. Each of the first 18 months was 20 days long, and the names of the months were pop, no, zip, zotz, tzec, xul, yoxkin, mol, chen, yax, zac, ceh, mac, kankin, muan, pax, koyab, cumhu. Instead of having names, the days of the months were denoted by
numbers starting from 0 to 19. The last month of Haab was called uayet and had 5 days denoted by numbers 0, 1, 2, 3, 4. The Maya believed that this month was unlucky, the court of justice was not in session, the trade stopped, people did not even sweep the
floor.



For religious purposes, the Maya used another calendar in which the year was called Tzolkin (holly year). The year was divided into thirteen periods, each 20 days long. Each day was denoted by a pair consisting of a number and the name of the day. They used
20 names: imix, ik, akbal, kan, chicchan, cimi, manik, lamat, muluk, ok, chuen, eb, ben, ix, mem, cib, caban, eznab, canac, ahau and 13 numbers; both in cycles.




Notice that each day has an unambiguous description. For example, at the beginning of the year the days were described as follows:




1 imix, 2 ik, 3 akbal, 4 kan, 5 chicchan, 6 cimi, 7 manik, 8 lamat, 9 muluk, 10 ok, 11 chuen, 12 eb, 13 ben, 1 ix, 2 mem, 3 cib, 4 caban, 5 eznab, 6 canac, 7 ahau, and again in the next period 8 imix, 9 ik, 10 akbal . . .



Years (both Haab and Tzolkin) were denoted by numbers 0, 1, : : : , where the number 0 was the beginning of the world. Thus, the first day was:




Haab: 0. pop 0



Tzolkin: 1 imix 0

Help professor M. A. Ya and write a program for him to convert the dates from the Haab calendar to the Tzolkin calendar.

Input

The date in Haab is given in the following format:

NumberOfTheDay. Month Year



The first line of the input file contains the number of the input dates in the file. The next n lines contain n dates in the Haab calendar format, each in separate line. The year is smaller then 5000.

Output

The date in Tzolkin should be in the following format:

Number NameOfTheDay Year



The first line of the output file contains the number of the output dates. In the next n lines, there are dates in the Tzolkin calendar format, in the order corresponding to the input dates.

Sample Input

3
10. zac 0
0. pop 0
10. zac 1995

Sample Output

3
3 chuen 0
1 imix 0
9 cimi 2801
两种日历,一种一年365天前18月每月20天第19月5天另一种日历一年260天20个月,然后进行日历转化
#include <iostream>
#include <cstdio>
#include <cmath>
#include <cstring>
#define exp 1e-6
#define pi acos(-1.0)
using namespace std;
char c[20][20]= {"pop", "no", "zip", "zotz", "tzec", "xul", "yoxkin", "mol", "chen", "yax", "zac", "ceh", "mac", "kankin", "muan", "pax", "koyab", "cumhu","uayet"};
char str[25][20]= {"imix", "ik", "akbal", "kan", "chicchan", "cimi", "manik", "lamat", "muluk", "ok", "chuen", "eb", "ben", "ix", "mem", "cib", "caban", "eznab", "canac", "ahau"};
char s[100];
int reach(char *s)
{
for(int i=0; i<19; i++)
if(strcmp(s,c[i])==0)
return i;
return 0;
}
void build(int n)
{
strcpy(s,str[n]);
}
int main()
{
int T;
int day,year;
int sum; scanf("%d",&T);
printf("%d\n",T);
while(T--)
{
scanf("%d. %s %d",&day,s,&year);
sum=year*365+reach(s)*20+day;
year=sum/260;
build(sum%20);
day=(sum%13)+1;
cout<<day<<" "<<s<<" "<<year<<endl;
}
return 0;
}

版权声明:本文为博主原创文章,未经博主允许不得转载。

上一篇:Android Bitmap Drawable 常用摘要


下一篇:javascript-让不和谐的bot仅用一个命令发送许多消息